The framing, electrical, and plumbing rough ins are done in my master bath and sheetrock is next! I can’t wait to see it take shape. I’ve taken special care to locate precisely where every outlet, switch, faucet, light fixture, etc. goes. I have provided special blocking in the walls for the toilet roll dispenser (that always wiggled out of the wall) and the medicine cabinets. I’m going to have an outlet inside my seated vanity cabinet for my hairdryer, so it will always stay plugged in. I have outlets in my extra deep medicine cabinets for electric toothbrushes and my husband’s razor, so they don’t have to sit on the counter. Every detail is important and changes like this make your bathroom so comfortable and custom made for you!
Framing
Related Posts
Before and After Master Bath
What to do with this big old fashioned tv cabinet in a master bath?Rip it out.Put a mirror in it's [...]
Design Plan for Modern Bathroom
Although I'm doing a lot of bathrooms lately, they don't all look the same. I practice cl[...]
Design Plan for a Bath Remodel
I'm working on several bathroom remodels currently, two have started construction just this past wee[...]
IN PROCESS: CURRENT PROJECTS
This year sped by at record pace.I'm way behind in posting pictures of some of the projects I[...]
More Project Photos
After - Living RoomMore before and after photos of my remodel project today. I posted previous[...]
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment
Click to see the code!
To insert emoticon you must added at least one space before the code.